Fraser Engineering · Free Tool

What is a preventive maintenance plan actually worth to you?

A good PM program isn't a cost — it's a hedge against emergency repairs, wasted energy, and equipment that dies before its time. Put in what you spend today and see the return, in real dollars. If the numbers don't justify it, we'll tell you that too.

Your current numbers

$
$
$
Reduction in emergency repairs with PM40%
Industry experience: planned maintenance commonly cuts reactive repair spend by 30–60% by catching failures early.
Energy savings from well-tuned equipment10%
Clean coils, correct refrigerant charge, and calibrated controls typically recover 5–15% of HVAC energy.
$
$
Net annual benefit
$0
after the PM contract
Return on investment
0%
first-year ROI
Return ratio
back per $1 spent

Where the value comes from

Estimated annual savings$0
Your PM investment$0

Let's build the plan around your equipment

These figures are a starting point. Fraser Engineering will inventory your systems and put a real preventive-maintenance program — and a real number — in front of you. No obligation.

Talk to our maintenance team

Or call us: (617) 332-3700 · 839 Upper Union Street, Franklin, MA 02038

Estimates are for planning purposes and based on the assumptions you set above plus standard industry ranges for reactive-repair reduction, energy recovery, and equipment-life extension. Actual results depend on equipment condition, run hours, and scope of work, which Fraser can assess on site.